Recently our church had the
opportunity to be involved in a collaborative VBS. We partnered with two other
churches. The VBS was actually held twice, once at the “mother” church and then
again at our church a month later.
We moved all of the decorations
down to our church and
reformatted them to fit our building. Here are a few of the results:
reformatted them to fit our building. Here are a few of the results:
Here is Mount Kilimanjaro at the "mother" church. Note the size of the elephant in their sanctuary. |
Here is Mount Kilimanjaro being set up at our church (along with the tree of life). |
Look how much larger the elephant appears! We eventually moved him out front and put the Tree of Life in the foreground. |
You can just see the tree trunk from the Tree of Life behind the elephant. The elephant really stood out when he was moved forward. |
Command strips, glue dots, binder
clamps and zip ties are used to hang and attach things. This enabled us to
re-hand and attach them at our church.
Instead of buying separate plastic tablecloths, plastic tablecloth rolls were purchased for areas requiring a large amount. Here the dark green plastic was from a roll. The lighter green plastic is individual table clothes . All of the plastic that had not been slit was kept for the next year.
This was the jungle room. We had jungle sounds playing on an iPad during VBS.
I loved how the sign that was used over an outdoor entrance at church #1 was re-purposed at our church. Since our building is brick, it could not be attached to the facility (without making permanent holes). So we used it as a sort of sign out front.
No comments:
Post a Comment